OPERATIONAL EXCELLENCE AND INCREASE IN VALUE IN THE MINING ACTIVITY
This category seeks to disseminate technical proposals that can bring about significant changes in productivity, safety, and costs in order to achieve operational excellence and an increase in value in the mining business.
POSTERTT-015: Design and automation of unit activities at Compañía de Minas Buenaventura S.A.A. - Yumpa
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:12:30pm
POSTERTT-044: Nanotecnología enfocada a la reducción de desgaste en elementos de contacto límite sometidos a cargas extremas
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:12:30pm
POSTERTT-061: Management and monitoring of instabilities in the Ferrobamba Tajo at Minera las Bambas S.A. – MMG – Peru
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:12:30pm
POSTERTT-480: Antamina Continuous Improvement Program
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:12:30pm
POSTERTT-077: Breaking Paradigms with the development and implementation of the Mine Integration System (M.I.S) in House
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:2:30
POSTERTT-120: Optimize daily grade control and real-time block model reconciliation
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:2:30pm
POSTERTT-159: Implementation of electronic initiation systems for blasting in the generation of ascending chimneys of great length (up to 25 meters) for the opening of the slot in the exploitation of the sub level stoping method in Cerro Lindo Mine
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:2:30pm
POSTERTT-509 Sanitary Intelligence and epidemiological surveillance COVID-19 for business continuity in Antapaccay Mining Company
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:2:30pm
POSTERTT-175: Strategic Mining Planning Software and RDP study
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:12:30pm
POSTERTT-179: Construcción de túneles, mediante Voladuras “Full emulsion”
Conference room:EXHIBICIÓN DE TOTEM - PRESENCIAL
Start Time:12:30pm
POSTERTT-203: Aerial photogrammetry with drones for structural mapping and strengthening of modeling and geotechnical evaluation
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:12:30pm
POSTERTT-209: Pumping Systems Inside Mine
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:2:30pm
POSTERTT-253: Generating value through geological resources in the short-term model
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:2:30pm
POSTERTT-315: Life monitoring of lifting cables for the P&H shovel fleet
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:2:30pm
POSTERTT-445: Mechanized Mining in Narrow Veins, HUARON Mine
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:12:30pm
POSTERTT-455: Eliminación dinámica de la incertidumbre en la planificación de minado subterraneo durante el covid-19 en la unidad Tambomayo – Compañía de Minas de Buenaventura S.A.A.
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:2:30pm
POSTERTT-457: Evaluación de Desempeño de Camiones de Acarreo con Modelamiento de curvas de Rimpull / Walter Aguayo, Supervisor Senior Mantenimiento Mina, Sociedad minera Cerro Verde
Conference room:TOTEM EXHIBITION - PRESENTIAL
Start Time:12:30pm
POSTERTT-477: Rockburst control in Minera Alpayana - Casapalca